A scored, evidence-led comparison of candidate sites across power, fibre, water, hazard, zoning and cost.

Explore services

How our site selection works

A scored, evidence-led comparison of candidate sites across power, fibre, water, hazard, zoning and cost. Every engagement starts with your brief: target MW, acreage, latency needs, budget and timeline.

We then screen parcels using utility data, carrier fibre maps, hazard layers and land records, visit shortlisted sites, and give you a clear, scored recommendation.

Deliverables

  • Weighted site-scoring model
  • Hazard and flood screening
  • Latency and fibre route maps
  • Board-ready recommendation
How it works

The Site Selection process, step by step

Five stages from brief to decision. Nothing moves to the next stage until the evidence behind it is written down.

  1. 01

    Weighting workshop

    We agree how much power, latency, cost, hazard and expansion really matter before anything is scored.

  2. 02

    Candidate set

    Six to twelve realistic sites are assembled across the markets in scope, marketed and off-market.

  3. 03

    Evidence gathering

    Utility headroom, carrier routes, flood and seismic layers, water access and land records are pulled per site.

  4. 04

    Scoring and sensitivity

    Sites are scored on the agreed model, then re-run to show which answers change if your weights move.

  5. 05

    Board recommendation

    A ranked order with the trade-offs written out, plus a credible fallback site.

Scope and outcome

What you get — and what it protects you from

Every Site Selection engagement produces documents you can hand to a board, a lender or a utility. Each one exists to close a specific risk.

Data Centre Site Selection in India — data center site selection

In your hands at the end

  • Weighted site-scoring model
  • Hazard and flood screening
  • Latency and fibre route maps
  • Board-ready recommendation

Risks it takes off the table

  • A preferred site chosen on familiarity rather than evidence
  • Scores that collapse the moment one assumption is questioned
  • Hazard exposure that only surfaces during insurance review
  • A single-site plan with no credible fallback
What we measure

The numbers behind every Site Selection recommendation

These are the thresholds and checks we apply, not averages. Where a site cannot meet one, we say so and show what it would take to fix it.

8–12
criteria in the model
Power, fibre, water, hazard, zoning, cost, access, expansion
≤2 ms
latency bands tested
To the nearest internet exchange, where it matters
1-in-100
flood return period screened
Alongside seismic zone and liquefaction notes
4–8 weeks
typical study
Longer when several states are in scope
Common pitfalls

What usually goes wrong in Site Selection

Most land problems in Indian data-centre projects are not bad luck — they are the same few shortcuts, repeated.

  • Weighting the model after seeing the scores

    Weights are signed off before any site is scored, so the ranking stays defensible to a board.

  • Treating a utility's verbal comfort as capacity

    Headroom is confirmed in writing against the feeder, not read off the substation nameplate.

  • Scoring only the sites you were shown

    We add off-market candidates so the comparison is not limited to what happens to be marketed.

Engagement models

Three ways to work with us on Site Selection

Start small if you only need a sanity check. Scope is agreed in writing before any work begins, so there are no open-ended bills.

Comparison of Site Selection engagement models
EngagementScreening checkFull studyEnd-to-end mandate
Best forTesting one parcel or an existing shortlist quicklyA decision you will have to defend to a board or lenderTaking it from brief all the way to signed and registered
Typical duration1–2 weeks4–8 weeks3–6 months
CommercialsFixed feeFixed fee, scoped upfrontRetainer plus a success fee on completion
What you receiveA short red-flag note with a go / no-go viewThe full pack: weighted site-scoring model, hazard and flood screening and the rest of the deliverablesEverything in the full study, plus negotiation, documentation and closing support
Site visitsOn requestEvery shortlisted siteAs often as the transaction needs
ExclusivityNoneNoneMandate for the agreed catchment and term

Site Selection by city

See all 262 locations →

Frequently asked questions

Data Centre Site Selection is a specialist service to secure data center site selection that meets data-centre needs for power, fibre, zoning and title.

Free consultation

Tell us your MW, acreage and timeline

We reply within one working day with matching parcels and a clear next step.

Your details go to our land team only. No spam, no sharing.

Powered byIRPR