Fibre Connectivity Assessment in India
Service

Fibre Connectivity Assessment in India

We map carrier fibre, distance to internet exchanges and routes to the submarine cable landing stations.

Explore services

How our fibre check works

We map carrier fibre, distance to internet exchanges and routes to the submarine cable landing stations. Every engagement starts with your brief: target MW, acreage, latency needs, budget and timeline.

We then screen parcels using utility data, carrier fibre maps, hazard layers and land records, visit shortlisted sites, and give you a clear, scored recommendation.

Deliverables

  • Carrier fibre map
  • Diverse route options
  • Latency to IX and cable stations
  • Dark-fibre feasibility
How it works

The Fibre Check process, step by step

Five stages from brief to decision. Nothing moves to the next stage until the evidence behind it is written down.

  1. 01

    Connectivity brief

    Which exchanges, cloud on-ramps and cable landing stations you must reach, and at what latency.

  2. 02

    Carrier mapping

    Live backbone and metro routes near the site, by carrier, with duct and lead-in availability.

  3. 03

    Route diversity

    Two physically separate paths are traced and any shared corridor or common entry point is flagged.

  4. 04

    Latency verification

    Route distances are converted into realistic latency to internet exchanges and landing stations.

  5. 05

    Build plan

    Lead-in options, dark-fibre feasibility, indicative build scope and carrier conversations opened.

Scope and outcome

What you get — and what it protects you from

Every Fibre Check engagement produces documents you can hand to a board, a lender or a utility. Each one exists to close a specific risk.

Fibre Connectivity Assessment in India — data center fibre connectivity

In your hands at the end

  • Carrier fibre map
  • Diverse route options
  • Latency to IX and cable stations
  • Dark-fibre feasibility

Risks it takes off the table

  • A well-connected site whose two routes share one duct
  • Lead-in build cost discovered after the land is bought
  • Latency that fails the workload you are hosting
  • Single-carrier dependence from day one
What we measure

The numbers behind every Fibre Check recommendation

These are the thresholds and checks we apply, not averages. Where a site cannot meet one, we say so and show what it would take to fix it.

2+
diverse physical routes
Separate corridors and separate building entries
3+
carriers approached
So pricing and terms stay competitive
≤2 ms
latency band to the nearest IX
Where the workload genuinely demands it
2–4 weeks
typical assessment
Carrier response times drive the timeline
Common pitfalls

What usually goes wrong in Fibre Check

Most land problems in Indian data-centre projects are not bad luck — they are the same few shortcuts, repeated.

  • Counting carriers on a coverage map

    We confirm live routes, duct availability and lead-in distance on the ground, not planned coverage.

  • Assuming the last mile is short

    Lead-in length, road-cutting permissions and build cost are quantified before you commit to the plot.

  • Taking one carrier's diversity claim

    Every route is checked against the others for shared corridors and common points of failure.

Engagement models

Three ways to work with us on Fibre Check

Start small if you only need a sanity check. Scope is agreed in writing before any work begins, so there are no open-ended bills.

Comparison of Fibre Check engagement models
EngagementScreening checkFull studyEnd-to-end mandate
Best forTesting one parcel or an existing shortlist quicklyA decision you will have to defend to a board or lenderTaking it from brief all the way to signed and registered
Typical duration1 week2–4 weeks2–5 months
CommercialsFixed feeFixed fee, scoped upfrontRetainer plus a success fee on completion
What you receiveA short red-flag note with a go / no-go viewThe full pack: carrier fibre map, diverse route options and the rest of the deliverablesEverything in the full study, plus negotiation, documentation and closing support
Site visitsOn requestEvery shortlisted siteAs often as the transaction needs
ExclusivityNoneNoneMandate for the agreed catchment and term

Fibre Check by city

See all 262 locations →

Frequently asked questions

Fibre Connectivity Assessment is a specialist service to secure data center fibre connectivity that meets data-centre needs for power, fibre, zoning and title.

Free consultation

Tell us your MW, acreage and timeline

We reply within one working day with matching parcels and a clear next step.

Your details go to our land team only. No spam, no sharing.