Quick answer
Hyperscale buyers look for large contiguous parcels, often 25–100+ acres, able to support hundreds of megawatts over several phases, with a dedicated substation option, diverse fibre, sufficient water or air-cooling suitability, low hazard risk and a clean, single-ownership title.
Key takeaways
- Contiguous land beats scattered parcels
- Dedicated substations are common
- Phasing drives the site plan
Land and power
Large contiguous parcels with room for a campus substation and future phases.
Water and cooling
Water availability and quality influence the cooling design and site choice.
Title and aggregation
Many large parcels are made up of several holdings; aggregation and title clean-up must be planned.