Quick answer
AI and GPU data centres need much more power per rack and often liquid cooling, so land must support larger substations, heavier floors and bigger cooling plants. Sites with very large, expandable power connections are now the most valuable.
Key takeaways
- Power density is much higher
- Liquid cooling changes layouts
- Large power connections are the priority
What changes
Higher rack density, heavier equipment, more cooling and bigger power connections.
Land implications
Prioritise parcels near high-capacity substations with space for on-site power infrastructure.
Need help with this?
Our team handles power availability study across India. Tell us your requirements and get a free shortlist.